Results continued
©2021 Viewpoint, Inc. All Rights Reserved.
Spend More Time on Site
Colmore Tang saw many benefits from changing from paper
based systems to digital methods. Field View meant workers
could spend more time on site rather than filling in paperwork
at the office.
"When people are out on site, we are able to build a safer job
with fewer incidents and accidents that's defect free
and reaches a higher standard for our client," Markall said.
The St Martin's Place project was unique as Field View was
used across the project in different locations. Colmore Tang
was utilising off-site construction techniques with the
manufacture of concrete panels in Belfast by subcontractor
Creagh Concrete. Structures were shipped to site as a finished
unit, with windows and insulation already fitted.
The collaborative nature of Field View was vital for Colmore
Tang and it resulted in freeing up time between the contractor
and its subcontractors, with a comprehensive, trackable audit
trail.
8