Customer Stories

Trimble Construction-case-study-EMEA-colmore-tang-2021

Issue link: https://www.viewpoint.com/resource-library/i/1274348

Contents of this Issue

Navigation

Page 7 of 9

Results continued ©2021 Viewpoint, Inc. All Rights Reserved. Spend More Time on Site Colmore Tang saw many benefits from changing from paper based systems to digital methods. Field View meant workers could spend more time on site rather than filling in paperwork at the office. "When people are out on site, we are able to build a safer job with fewer incidents and accidents that's defect free and reaches a higher standard for our client," Markall said. The St Martin's Place project was unique as Field View was used across the project in different locations. Colmore Tang was utilising off-site construction techniques with the manufacture of concrete panels in Belfast by subcontractor Creagh Concrete. Structures were shipped to site as a finished unit, with windows and insulation already fitted. The collaborative nature of Field View was vital for Colmore Tang and it resulted in freeing up time between the contractor and its subcontractors, with a comprehensive, trackable audit trail. 8

Articles in this issue

view archives of Customer Stories - Trimble Construction-case-study-EMEA-colmore-tang-2021