Customer Stories

TC-ClientStory-Gamuda

Issue link: https://www.viewpoint.com/resource-library/i/1220967

Contents of this Issue

Navigation

Page 10 of 11

Client Highlights A few of Gamuda's recent project higlights: • Work on the innovative Stormwater Management and Road Tunnel (SMART) in Malaysian capital Kuala Lumpur in which Gamuda's own engineering division developed and executed a plan to merge a stormwater diversion channel with a double-deck motorway in a single tunnel, solving the capital city's draining/flood mitigation and traffic problems. • The stormwater tunnel project was also Malaysia's first-ever use of a mixshield (slurry) tunnel boring machine (TBM), one of the largest in South East Asia at that time at 13.21m diameter, which received media attention from National Geographic. • The conversion of 329 kilometres of the country's single-track rail lines into double-track rail lines currently running the north-south axis of Malaysia. • Work on the country's Mass Rapid Transit (MRT) Line 2 project,an approximately 50 kilometre rail line connecting the communities of the greater Klang Valley traversing Sungai Buloh-Serdang and Putrajaya, in which Gamuda deployed the variable density tunnel boring machine, as the world's first machine with the capabilities to not only drill into rock, but also soft grounds which permeate the Kuala Lumpur region. ©2021 Viewpoint, Inc. All Rights Reserved. 11

Articles in this issue

view archives of Customer Stories - TC-ClientStory-Gamuda