Customer Stories

Viewpoint_CS_VFP_Arsenal_Football_Club_2018_FINAL

Issue link: https://www.viewpoint.com/resource-library/i/1074927

Contents of this Issue

Navigation

Page 0 of 1

C A S E S T U D Y VIEWPOINT.com | +1 800.333.3197 Sir Robert McAlpine built a 60,000 seat stadium with Viewpoint For Projects™ Software on the team In 2004 Sir Robert McAlpine signed a design and build contract to build a 60,000 seat stadium. The major challenge was to complete the project for the next Premier League season – a demanding timetable, especially in view of other high profile stadium projects running into considerable difficulties. With schedules tight, the complexity of the project required all parties in the development to collaborate closely. Over 100 different organizations were involved, with over 450 individuals using Viewpoint For Projects. The site covered an area of 17 acres and the program consisted of four separate projects, namely infrastructure, the North Bridge building, the Northern Triangle, and the Emirates Stadium itself. During the course of the assignment, over 70,000 drawings were uploaded, and over 700,000 documents downloaded. This monumental task of project management was deemed a major success when the stadium was handed over two weeks ahead of schedule – and on budget. The finished stadium consists of 60,000 seats, 7,000 Club Level seats with attached restaurants, and 150 executive boxes, with a capacity to serve 2,000 meals on match day. Also included are 250 catering serving points and over 900 restrooms, capacity for up to 250 wheelchair users, 41 TV camera positions, and 215 seats for media. VIEWPOINT.com | +1 800-688-8226 Arsenal Emirates Stadium PROJECT SNAPSHOT Sir Robert McAlpine built a 60,000 seat stadium with Viewpoint For Project Collaboration ™ Software on the team In 2004 Sir Robert McAlpine signed a design and build contract to build a 60,000 seat stadium. The major challenge was to complete the project for the next Premier League season – a demanding timetable, especially in view of other high profile stadium projects running into considerable difficulties. With schedules tight, the complexity of the project required all parties in the development to collaborate closely. Over 100 different organizations were involved, with over 450 individuals using Viewpoint For Project Collaboration. The site covered an area of 17 acres and the program consisted of four separate projects, namely infrastructure, the North Bridge building, the Northern Triangle, and the Emirates Stadium itself. During the course of the assignment, over 70,000 drawings were uploaded, and over 700,000 documents downloaded. This monumental task of project management was deemed a major success when the stadium was handed over two weeks ahead of schedule – and on budget. The finished stadium consists of 60,000 seats, 7,000 Club Level seats with attached restaurants, and 150 executive boxes, with a capacity to serve 2,000 meals on match day. Also included are 250 catering serving points and over 900 restrooms, capacity for up to 250 wheelchair users, 41 TV camera positions, and 215 seats for media. Arsenal Emirates Stadium viewpoint.com | 800.333.3197 © 2014 Viewpoint, Inc. dba Viewpoint Construction Software. All Rights Reserved. PROJECT PROFILE PROJECT SNAPSHOT Total Document Uploads: 72,631 Total Document Downloads: 753,631 Organizations Involved: 118 Users: 461 Documents/Drawings: 58,808 Product: Total Document Uploads: 72,631 Total Document Downloads: 753,631 Organizations Involved: 118 Users: 461 Documents/Drawings: 58,808 Product:

Articles in this issue

Links on this page

view archives of Customer Stories - Viewpoint_CS_VFP_Arsenal_Football_Club_2018_FINAL